COLLECTION OF STANDING CIRCULARS |
S.NO. | TC NO. | TITLE | MORE INFORMATION |
1 | TC NO. 1 | CHECK LIST OF DATA REQUIRED FOR DESIGNS OF EARTH DAMS |  |
2 | TC NO. 2 | CHECK LIST OF DATA REQUIRED FOR DESIGNS OF MASONRY DAMS |  |
3 | TC NO. 3 | CHECK LIST OF DATA REQUIRED FOR DESIGNS OF CROSS DRAINAGE WORKS |  |
4 | TC NO. 4 | ESTIMATE OF YIELDS FOR VARIOUS DEPENDENCIES AT PROJECT SITES |  |
5 | TC NO. 5 | PROVISION OF U/S CONCRETE MEMBRANE IN MASONRY DAM SECTION. |  |
6 | TC NO. 6 | SAFETY OF DAM- REVIEW OF SPILLWAY CAPACITY. |  |
7 | TC NO. 7 | WITHDRAWN |  |
8 | TC NO. 8 | PROTECTION OF UPSTREAM SLOPES FOR RESERVOIR EMBANKMENT. |  |
9 | TC NO .9 | REVISED DOWNSTREAM SLOPE PROTECTION OF RESERVOIRS EMBANKMENT |  |
10 | TC NO. 10 | CREST WIDTH OF EARTH/ROCKFILL DAMS |  |
11 | TC NO. 11 | CORE IN EARTH DAMS |  |
12 | TC NO. 12 | PROVISION OF BERMS |  |
13 | TC NO. 13 | SHRINKAGE/SETTLEMENT/ ALLOWANCE & EARTH / ROCKFILL DAM |  |
14 | TC NO. 14 | BENCHING/STRIPPING/PLOUGHING & FURROWING FOR CANAL EMBANKMENT |  |
15 | TC NO. 15 | TRANSMISSION LOSSES,SYSTEM EFFICIENCIES |  |
16 | TC NO. 16 | TYPE SECTIONS FOR MINOR, WATER COURSES, AND FIELD CHANNELS |  |
17 | TC NO. 17 | CANAL IN EXPANSIVE SOILS IDENTIFICATION AND TREATMENT |  |
18 | TC NO. 18 | ZONING OF MATERIALS FOR GRAVITY DAM AND APPURTEMENT WORKS |  |
19 | TC NO. 19 | FREE BOARD IN CANALS |  |
20 | TC NO. 20 | NECESSITY AND TYPE OF DRAINAGE ARRANGEMENT BEHIND LINNING |  |
21 | TC NO. 21 | NOT ISSUED |  |
22 | TC NO. 22 | FREE BOARD REQUIREMENT IN EMBANKMENTS DAMS |  |
23 | TC NO. 23 | COMPRESSIVE STRENGTH OF MASONRY MORTAR-SIZE OF SPECIMEN FOR TESTING |  |
24 | TC NO. 24 | ANCHORING AND SPLICING OF REINFORCING BARS |  |
25 | TC NO. 25 | ESTIMATION OF CROP WATER REQUIREMENT AND IRRIGATION WATER REQUIREMENT |  |
26 | TC NO. 26 | STRUCTURE ON WATER COURSES/FIELD CHANNELS : DESIGNS GUIDELINES |  |
27 | TC NO. 27 | UNDER SEEPAGE CONTROL MEASURES FOR EARTH AND ROCKFILL DAM/CORRECTION |  |
28 | TC NO. 28 | GUIDELINES FOR SELECTION OF SPILLWAY AND ENERGY DISSIPATERS |  |
29 | TC NO. 29 | TOP WIDTH OF GRAVITY DAM |  |
30 | TC NO. 30 | DESIGN & CONSTRUCTION WORK OF STOP DAM |  |
31 | TC NO. 31 | NOT ISSUED |  |
32 | TC NO. 32 | DESIGN CRITERIA FOR MINOR IRRIGATION SCHEMES |  |
33 | TC NO. 33 | SELECTION OF TYPE OF GATE (Revised) |  |
34 | TC NO. 34 | GUIDELINES FOR DESIGN OF A.P.M. |  |
35 | TC NO. 35 | GUIDE LINES FOR FLOOD PROTECTION EMBANKMENT SECTIONS |  |
36 | TC NO. 36 | GUIDELINES FOR DESIGNS OF STOPDAM ON CONTINUOUS PREVIOUS FOUNDATIONS |  |
37 | TC NO. 37 | GUIDELINES FOR SELECTION OF SITE AND DESIGNS OF PERCOLATION TANK |  |
38 | TC NO. 38 | USE OF QUARRY SPALLS BELOW PITCHING IN CANALS |  |
39 | TC NO. 39 | GUIDELINES FOR SELECTION OF ELECTRICALLY DRIVEN PUMPS FOR LEFT IRRIGATION SCHEMES |  |
40 | TC NO. 40 | STABILITY ANALYSIS OF EARTH DAMS & GUIDELINES FOR MAINTENANCE OF LIFT IRRIGATION SCHEMES |  |
41 | TC NO. 41 | RUGOSITY COEFFICIENT FOR WATER CARRIERS (ARTIFICIAL/NATURAL) & DESIGN OF NON OVERFLOW GRAVITY DAM SECTION |  |
42 | TC NO. 42 | GUIDELINES FOR DESIGN OF SMALL EARTH DAMS & APPLYING UNIFORM SPECIFICATIONS FOR SIMILAR STRUCTURES |  |
43 | TC NO. 43 | GUIDELINES FOR DESIGN OF RIGID DIAPHRAGM WALL FOR SEEPAGE CONTROL |  |
44 | TC NO. 44 | GUIDELINES REGARDING REDUCTION IN DESIGNED IRRIGATION CAPACITY DUE TO IRRIGATION ACTIVITY BY FARMERS USING PUMPBESIDE CANAL IN "OUT OF COMMAND AREA" IN MAJOR AND MEDIUM PROJECTS |  |
45 | TC NO. 45 | GUIDELINES FOR RESTORATION OF DISTRESSED MINOR IRRIGATION TANKS |  |
46 | TC NO. 46 | CONSTRUCTION OF CONCRETE LADDERS IN MAIN BRANCH AND DISTRIBUTORY CANALS |  |
47 | TC NO. 47 | USE OF M-10CONCRETE LINNING IN CEMENT CONCRETE LINING IN CANAL SYSTEM |  |
48 | TC NO. 48 | GUIDELINES FOR PROVISION OF FUSE PLAG SPILLWAY OR BREACHING SECTION FOR INLAND RESERVOIRS |  |
49 | TC NO. 49 | CONTROL OF SEEPAGE THROUGH BODY OF EARTH DAM |  |
50 | TC NO. 50 | DESIGN OF SHUTTERS FOR STOP DAM |  |
51 | TC NO. 51 | ESTIMATION OF DEAD STORAGE OF SMALL DAMS UP TO 5 MCM UP TO 500 Ha CCA |  |
52 | TC NO. 52 | TECHNICAL CIRCULAR FOR ESTIMATION OF DESIGN FLOOD SMALL DAMS |  |
53 | TC NO. 53 | PRELIMINARY CHECK STATEMENT FOR GENERAL FEASIBILITY OF PROJECTS |  |
54 | TC NO. 54 | GUIDELINES FOR PROVISION OF PARAPET WALL ON THE TOP OF EXISTING EARTH / ROCK- FILL DAMS |  |
55 | TC NO. 55 | Workability of Cement Concrete Slump Test.  |  |
56 | TC NO. 56 | Compressive Strength of Cement Concrete - Size and preparation of specimen for testing.  |  |
57 | TC NO. 57 | Testing of Core Specimen from Hardened Concrete.  |  |
58 | TC NO. 58 | Best Construction practices for Rehabilitation/strengthening of existing earthen bunds.  |  |
59 | TC NO. 59 | Revised Guidelines for Transmission Losses: System Efficiency  |  |
60 | TC NO. 60 | Revised Guidelines for Canal Lining. (Dated 25-07-2019)  |  |
61 | TC NO. 62 | Guidelines for Fixation of Gates and Acquisition of Land /Property under Dams, Barrages and their Reservoir. (Dated 06-08-2020)  |  |